Geophysical Engineer on Offshore Wind Farm Project (Belgium)

Company

Geoxyz

Email

alice.lovatt@geoxyz.eu

Opening Date

2023-05-10

Position

Engineer

Description

Position: 1 x Geophysical Engineer (ScanFish experience strongly preferred),
Start date: 17th May (+/- 2 days)
Duration: 4 weeks
Project 1: UXO ID & removal services (MBES, SSS, MAG) – Belgium (outside 12nm limit)
Project 2: Offshore wind farm – UXO survey (MBES, SSS, SBP, MAG, dual ScanFish) – Sweden (inside and outside 12nm limit)


Share vacancy: