Our client is looking for a GWO Crane Operator to mobilise on the below date. This will be on a 2/2 rotation until the end of the campaign, likely into September. GWO Crane Operator Mobilising from Montrose EMob Date: 30/07/2024 for 14 nights, 2/2 rotation until end of campaign PAYE or LTD Co available Required Certification: Crane Op Stage 3 AIl GWOs OEUK Chester Step Test