ETO Heavy Lift TBC U 4-5 Weeks (Potential ongoing rotation) UK - Within 12mile. Must have UK Frontier Work Permit. or UK Citizenship [STCW, MEDICAL, OPITO SURVIVAL, HIGH VOLTAGE, MARLINS TEST]
Explore approved maritime roles in a cleaner listing layout with a more readable category tree and better scanability across titles, salary and posting dates.
Latest approved roles in this category selection.
ETO Heavy Lift TBC U 4-5 Weeks (Potential ongoing rotation) UK - Within 12mile. Must have UK Frontier Work Permit. or UK Citizenship [STCW, MEDICAL, OPITO SURVIVAL, HIGH VOLTAGE, MARLINS TEST]
ETO Well Intervention/DSV 28/10 1-2 Weeks UK/ Aberdeen Well Intervention, or strong DSV experience required [STCW, BOSIET, MEDICAL, BIDELTOID, UK CEC, OGUK, MIST]
Worldwide Recruitment Solutions are looking for an ETO to join a DP2 Geotechnical Survey vessel from the 26th of September for 8 weeks. You willl be joining in the Netherlands. You must have Passport ENG 1/ILO Medical Seamans/Discharge book (COC)...
ETO Role** -Fly 23rd September -6 Weeks -Vessels in EU -Dredger Vessel EU Nationals only due to flag of the vessel
We are urgently looking for ETO for AHTS! Joining: ASAP in Sweden C.D. 6 weeks Required Obligatory: DP Maintenance Certificate and AHTS experience
ETO is required for subsea support vessel DP2 Start 18/09 Duration +/- 6 weeks Area the UAE Requirements: Experience in rank on offshore construction, ROV, Diving, subsea support vessels. DP maintenance BOSIET, CA-EBS GWO Sea survival - can be arranged...
We have below urgent requirement: Position: ETO for DP2 PSV Vessel Location: Ghana Traveling: 20/09/2025 Experience: Minimum 15 months of experience as an ETO on DP2 PSV vessels and must have Diesel Electric and Bergen Engine experience If interested, please...
ETO AHT Tug Start ASAP Vessels in USA- B1 OCS preferred 6 Weeks If interested send your cv to e-mail
ETO x2 DP3 Pipelay Vessel Starts 24th September 5.5 off Vessels in Asia
Worldwide Recruitment Solutions are looking for ETO to join Heavy Lift vessel for Aramco project by November end for 3 months.